Here's an update from Michael D. Douglass:
Hello everyone, I wanted to share some exciting news about the new fire truck we're in the process of building. The unit is an SVI body mounted on a Sutphen Ambassador chassis. The chassis is scheduled to arrive at the SVI facility next week, and the plan is to have the entire unit completed by early fall. However, things are moving faster than expected, so it might be ready sooner than anticipated.
I've attached a PDF showing the preliminary graphics for the truck. These have been approved, with the only change being that the lettering will be done in gold leaf instead of the orange shown in the design. I’ve also included a photo of the body subframe and six images from the fabrication process. You can view these photos on SVI’s website under the “Watch Your Truck Being Built†gallery at www.svitrucks.com.
I’ll keep you updated as more information becomes available. Thanks for your continued support.
Yours in Fire Safety,
Michael D. Douglass
Lieutenant / Public Education and Information Officer, Cary Fire Protection District
Front/side officer’s side. SVI Trucks photo
Compartment detail. SVI Trucks photo
Compartment detail. SVI Trucks photo
Sub frame. SVI Trucks photo
Rear/side officer’s side. SVI Trucks photo
Rear view. SVI Trucks photo
Graphics layout for new Cary squad 255. SVIGraphics Department
Graphics layout for new Cary squad 255. SVIGraphics Department
Metal Stamping Lathing,Welding Structure Part,Oem Metal Machined Parts,Commercial Mechanical Molds
Weifang Yida Mould Co.,Ltd , https://www.wfyidamold.com